How to Install Bitumen Corrugated Roofing Sheets: Complete Step-by-Step DIY Guide

Reference Specifications & Preparation Checklist

Installing bitumen corrugated roofing sheets requires precise batten spacing, correct side and end overlaps, and proper roof pitch evaluation to ensure long-term weatherproofing. Matching your timber framing support to the slope of your roof prevents sheet sagging, structural failure, and water ingress during heavy rainfall.

Specification Matrix (Roof Pitch vs. Batten Spacing vs. Laps)

Review the technical framing requirements in the table below before measuring timber purlin centers or cutting materials. The roof pitch determines whether open battens are sufficient or if a continuous timber roof deck is required.

Required Tools & Safety Checklist

Gathering the correct tools and safety gear before starting guarantees smooth installation and clean, burr-free cuts across the corrugated profile.

  • Coarse-tooth handsaw or circular saw: Keeps cuts straight across sheet corrugations.
  • WD-40 blade lubricant: Prevents hot bitumen binding and tar buildup on saw blades.
  • Bitumen fixings: Heavy-duty drive nails or self-tapping screws equipped with flexible EPDM waterproof caps.
  • Timber battens or OSB board: Provides structural framing based on your measured roof pitch.
  • Tape measure and chalk line: Ensures straight fixing grids and accurate sheet alignment.
  • Cordless drill/driver: Set to appropriate torque limits to prevent crushing sheet crowns.
  • Crawling boards or timber planks: Distributes body weight evenly across purlins during roof access.
  • Personal Protective Equipment (PPE): Safety goggles, heavy-duty work gloves, and non-slip footwear.

Pre-Installation Planning: Structural Decking & Batten Framing

Proper structural planning and accurate framing setup form the foundation of a durable, leak-free corrugated bitumen roof. Evaluating your timber support requirements before purchasing materials prevents structural sagging and ensures compliance with manufacturer load limits.

Measuring Roof Pitch and Determining Timber Support Requirements

Accurately calculating your roof pitch determines whether you can use spaced timber battens or if a continuous solid deck is legally and structurally mandatory. Always verify slope angles using a digital pitch finder or smartphone slope app placed flat against existing rafters or newly installed roof timbers.

  • Step 1: Clear the rafters of any debris to ensure your slope measuring tool sits completely flush against the timber surface.
  • Step 2: Take multiple measurements across different sections of the roof framing to account for any uneven settling or framing variations.
  • Step 3: Match the calculated pitch angle to structural framing rules, ensuring your timber rafters and batten centers align with weather loading expectations.

Installing Support Battens vs. Continuous Solid Roof Decking

Choosing between open purlins and a continuous solid roof deck depends entirely on your roof gradient to prevent dangerous sagging under snow or wind loads. Low-slope outbuildings under 10 degrees require a solid 18 mm OSB or plywood deck rather than standard spaced timber battens to distribute weight evenly.

  • Open Purlin Framing: Suitable for pitches of 10 degrees and above, utilizing treated timber battens spaced at strict center-to-center intervals.
  • Solid Decking: Mandatory for low-slope structures below 10 degrees, requiring a fully supported, moisture-resistant plywood or OSB deck.
  • Manufacturer Guidelines: For comprehensive structural tolerances, consult the official Onduline professional installation guidelines.

Eaves, Verge, and Ventilation Considerations

Proper alignment of the initial eaves batten and gable verges ensures correct sheet overhang and maximum wind uplift resistance. Incorporating an adequate condensation barrier and roof ventilation prevents trapped moisture from rotting underlying timber framing over time.

  • Eaves Fascia Alignment: Position the first timber batten flush with the eaves fascia to support the required 50 mm to 70 mm sheet drip overhang.
  • Ridge Line Leveling: Ensure the top ridge batten provides a solid nailing surface for apex ridge caps and ventilation closures.
  • Condensation & Ventilation: Install breathable membranes or condensation barriers beneath open purlins to manage moisture transfer in uninsulated outbuildings.

How to Measure and Cut Bitumen Roofing Sheets Cleanly

Achieving clean, straight cuts across bitumen corrugated roofing sheets requires using the correct cutting tools and proper lubrication to prevent tar binding. Incorrect cutting techniques distort corrugation profiles, tear edge fibers, and create uneven seams that compromise weatherproofing.

Recommended Cutting Tools (Handsaw vs. Circular Saw vs. Angle Grinder)

Selecting the right saw depends on the volume of sheets and your preferred cutting speed. Coarse-tooth handsaws offer maximum control for small trimming jobs, while fine-tooth circular saw blades deliver fast, precise cuts across multiple sheets.

  • Handsaw: Use a coarse-toothed wood saw for manual cutting. It generates minimal heat, reducing the risk of thermal expansion softening the sheet edge.
  • Circular Saw: Use a high-speed circular saw blade with fine carbide teeth. Clamp a straight edge guide across the sheet to maintain a true cut line.
  • Angle Grinder Caution: Avoid using high-RPM metal cut-off discs, as friction heat melts the bitumen binder, clogging the blade and leaving jagged, sticky edges.

The Blade Lubrication Technique (Preventing Tar Sticking)

Bitumen binding occurs when friction heat warms the asphalt matrix during cutting, causing dense tar residue to coat saw teeth and seize the blade. Applying a continuous lubricant barrier prevents gumming and keeps cut lines smooth.

  • Apply Blade Lubricant: Spray saw teeth generously with WD-40, silicone lubricant, or household vegetable oil prior to every major cut.
  • Reapply Frequently: Re-spray the blade midway through long cuts across wide corrugated panels to eliminate friction drag.
  • Clean the Blade Immediately: Wipe down saw teeth with a rag soaked in mineral spirits right after cutting to remove leftover tar buildup.

Marking Corrugations Accurately Across Long Sheets

Measuring across uneven corrugated peaks and troughs requires sturdy straight-edge guides to avoid crooked cut lines. Turning the panel upside down before using power saws ensures smooth blade entry along corrugation crowns.

  • Step 1: Mark Cut Lines: Snap a chalk line across the corrugation peaks, or mark points with a white pencil and secure a timber batten using a straight edge clamp.
  • Step 2: Flip for Power Sawing: Turn the bitumen sheet face down when using a circular saw so the blade teeth cut into the underside first, preventing chipping along the visible face.
  • Step 3: Support the Cut Panel: Support both sides of the sheet along full-length workbenches or timber scrap to prevent the cut piece from tearing under its own weight as you finish the pass.

Step-by-Step Installation: Positioning, Overlapping & Staggering

Correct sheet positioning and precise overlapping safeguard your roofing frame against wind uplift and water leakage. Executing a systematic bottom-up layout ensures every joint sheds rainwater efficiently while maintaining structural integrity across timber purlins.

Step 1: Laying the First Sheet (Prevailing Wind & Eaves Overhang)

Always start your bottom row at the corner facing away from the prevailing wind to prevent local gusts from driving rain underneath side laps. Maintain a strict 50 mm to 70 mm eaves overhang to form a clean drip edge directly into your gutter system.

Overhanging past 70 mm causes the plastic-bitumen edge to sag under thermal loads, while keeping it under 50 mm causes water to capillary-back onto the timber fascia board and rot the structure.

  • Prevailing Wind Direction: Identify local weather patterns and position your starting sheet on the downwind corner so overlapping flaps face away from oncoming gales.
  • Eaves Alignment: Align the bottom sheet edge carefully with a chalk line parallel to the gutter line to keep rows straight.
  • Initial Placement: Press the first panel squarely against the corner batten before securing any fixings.

Step 2: Side and End Overlap Rules for Water Tightness

Overlapping adjacent bitumen sheets correctly prevents capillary water drawing and moisture penetration during heavy storms. Side laps should span at least one to two corrugations depending on your roof pitch and site exposure.

Working methodically from bottom to top ensures upper panels drain directly over lower panels, eliminating back-flow vectors along horizontal joints.

  • Horizontal Overlap (Side Laps): Overlap by 1 corrugation for pitches over 15 degrees, or 2 corrugations for shallower pitches and high-wind zones.
  • Vertical Overlap (End Laps): Ensure upper sheets overlap lower panels by 170 mm to 300 mm, matching your specific roof slope requirements.
  • Sealant Application: Lay overlapping seams smoothly without twisting or stretching individual corrugated profiles.

Step 3: Staggering Joints (Broken-Bond Pattern to Avoid 4-Sheet Bulges)

Staggering your vertical seams using a broken-bond pattern eliminates bulky four-sheet corner overlaps that distort sealing lines and create water channels. Cutting the first sheet of alternate rows in half structurally distributes weight and locks seams securely.

Without staggered seams, four panel corners converge at a single intersection, creating an uneven gap that prevents waterproof caps from seating flat.

  • Broken-Bond Execution: Start row two with a half-width sheet so vertical joints never align consecutively across adjacent rows.
  • Staggered Seams: Ensure horizontal and vertical overlaps remain tight and flush before driving any permanent fasteners into support timbers.
  • Grid Alignment: Check row straightness every two rows using a string line to prevent panel drift.

Fastening Rules: Correct Screw & Nail Placement Patterns

Securing bitumen corrugated roofing sheets requires strict adherence to fixing rules to prevent wind uplift and guarantee long-term weatherproofing. Using incorrect fixing techniques or improper torque settings severely damages panel profiles and creates immediate paths for water leaks.

Crucial Rule: Always Fasten Through the Crown (Peak), Never the Trough

Fasten bitumen roofing sheets strictly through the crown (the high point) of the corrugation profile using approved bitumen screws or heavy-duty drive nails. Driving fasteners into the trough (valley) is a critical error because rainwater channels heavily through corrugation valleys, funneling water directly down screw shafts and rotting the support battens beneath.

  • Crown Fixing Principle: Securing through corrugation peaks elevates the fixing hole well above active water runoff paths.
  • Waterproof Cap Protection: Always ensure drive nails or screws feature integrated flexible EPDM washers and snap-fit protective caps to shield the fastener head from direct rain exposure.
  • Preventing Valley Damage: Never place fixings in corrugation troughs, even if it seems easier to line up with underlying purlins.

Fixing Count & Placement Grid (Eaves, Intermediate Battens & Ridges)

Maintain a structured fastening grid across your roof surface to ensure maximum wind resistance and prevent panels from rattling or pulling free during storms. Adjusting your fixing density across different purlin zones distributes holding force evenly across timber support battens.

  • Eaves & Ridge Lines: Secure every single corrugation peak along the bottom eaves edge and top ridge line to counter strong edge wind forces.
  • Side Overlap Seams: Drive a fixing through every corrugation along the overlapping side seam where two panels meet.
  • Intermediate Battens: Fasten through every second corrugation peak on all intermediate support purlins running through the middle of the sheet.

How to Avoid Over-Tightening Bitumen Fasteners

Proper torque control is essential when driving screws into flexible asphalt-based roofing sheets. Over-tightening crushes the corrugated peak, creating a concave depression that holds pooled water and fractures the bitumen sheet matrix.

  • Snug Washer Compression: Tighten fasteners just until the flexible EPDM washer forms a firm, flush seal against the sheet crown without deforming the corrugated profile.
  • Avoid Profile Distortion: Stop driving immediately if the corrugation peak begins to indent or crush downward.
  • Clutch Adjustment: Set your cordless drill driver to a low torque setting before installing screws across timber battens.

Ridge Caps, Verge Trims, & Weather Proofing Accessories

Completing your roofing assembly with the correct accessories seals vulnerable perimeter gaps against wind uplift, rain penetration, and draft intrusion. Proper finishing along ridges and gable edges ensures long-term structural protection and a professional visual result.

Installing Apex Ridge Caps Over Top Rows

Position apex ridge caps over the top roof junction to seal the central peak against heavy weather. Always begin installing ridge units from the side opposite the prevailing wind direction so overlapping joints shed driven rain away from internal roof timber framing.

  • Overlap Specifications: Overlap adjacent ridge cap sections by at least 125 mm to 200 mm to create a watertight horizontal join.
  • Fastening Method: Drive fixings through the ridge cap and down into every underlying corrugation peak of the main roof sheets, anchoring directly into the top ridge batten.
  • Alignment Control: Maintain a straight line along the roof apex using a taut string line across the entire ridge length.

Securing Gable Ends with Side Verge Trims / Bargeboards

Protecting gable ends with dedicated verge trims or timber bargeboards prevents high-velocity winds from getting underneath edge corrugations and causing wind uplift failure. Sealing these side perimeters stabilizes outer panel edges against severe gale force gusts.

  • Verge Trim Placement: Fit flexible bitumen verge trims or continuous aluminum edge sections snugly over the outer edge corrugation along the gable end.
  • Fastener Spacing: Fasten verge accessories into side timber bargeboards at maximum 100 mm center-to-center intervals to guarantee structural security.
  • Weatherproofing Sealant: Apply a bead of flexible roofing sealant beneath verge overlaps in high-exposure areas for added weather protection.

Inserting Foam Eaves Fillers for Draft and Pest Prevention

Pre-molded foam closure strips mirror the corrugated sheet profile to plug gaps beneath ridge caps and along eaves lines. Installing these foam fillers creates a tight seal that blocks driving rain, wind drafts, insect nesting, and bird entry without restricting essential timber frame ventilation.

  • Eaves Position: Fit molded foam eaves fillers directly underneath the bottom sheet edges on top of the first timber support batten.
  • Ridge Position: Push top foam closure strips under the bottom edge of apex ridge caps before driving final fixings.
  • Pest Barrier: Ensure foam strips remain compressed snugly to prevent small pests and debris from penetrating the roof cavity.